BIDFINDER Account

Combined Synopsis/Solicitation · 36C24127Q0030

Eaton Powerware System Replacement

Department of Veterans Affairs in Manchester, NH is taking offers on this bid: Eaton Powerware System Replacement. Offers are due November 30, 2026, 5:00 PM. The official notice on SAM.gov has the documents and says how to send an offer.

Data checked November 28, 2026 against SAM.gov.

Agency
Department of Veterans Affairs Federal241-NETWORK Contract Office 01 (36C241)
Place
Manchester, NH
Offers due
November 30, 2026, 5:00 PM (ET) closes in 2 days
Estimated value
not stated
Notice type
Combined Synopsis/Solicitation
Category
Maintenance and repair
NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Product service code (PSC)
J061
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
November 24, 2026
Solicitation number
36C24127Q0030
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Maintenance and repair in New Hampshire

1 free weekly alert, or same-day alerts (up to 50) with BidFinder Pro ($8 a month).

BLACK FRIDAY · 67% OFF · ENDS 30 NOV

Black Friday: 1 year of same-day bid alerts for $32

Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.

See Black Friday offer

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

What is this bid for?

36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton? Due to the complex nature of the product and criticality - Yes Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance? See answer to RFI 1 Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures? Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton? Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications? The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)? Yes, See photos. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5? The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design. What are the existing input voltage and output voltage? Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc 204A Please provide a photo of the existing unit's data plate. See attached photos Please provide photos of the full system (standing back) and of the battery cabinet and batteries. See attached photos Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP. Confirmed What is the current battery run time, and what run time is required for the replacement? 60 minutes would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System attached Will the VA be paying invoices on a Net-30/45/60 schedule? The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.

Questions about this bid

When are offers due for 36C24127Q0030?

Offers are due November 30, 2026, 5:00 PM (closes in 2 days).

Which agency is buying, and where?

Department of Veterans Affairs in Manchester, NH. BidFinder lists 474 open federal bids from this agency right now.

Does this bid have a set-aside?

Yes: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14).

How do I submit an offer?

Open the official notice on SAM.gov: it has the documents and the instructions for responding.

Is this bid still open?

Yes, it is listed as open here. BidFinder last read it from SAM.gov on November 28, 2026.

Where can I find more bids like this?

What else is this agency asking for?

Which similar bids are open?