Solicitation · 36C25027Q0078
Fire Suppression System Maintenance and
Department of Veterans Affairs in Dayton, OH is taking offers on this bid: Fire Suppression System Maintenance and. Offers are due December 8, 2026, 10:00 AM. The official notice on SAM.gov has the documents and says how to send an offer.
Data checked November 28, 2026 against SAM.gov.
- Agency
- Department of Veterans Affairs Federal250-NETWORK Contract Office 10 (36C250)
- Place
- Dayton, OH
- Offers due
- December 8, 2026, 10:00 AM (ET) closes in 10 days
- Estimated value
- not stated
- Notice type
- Solicitation
- Category
- Maintenance and repair
- Product service code (PSC)
- J012
- Posted
- November 19, 2026
- Solicitation number
- 36C25027Q0078
Opens the notice on SAM.gov, with its attachments and how to respond.
Black Friday: 1 year of same-day bid alerts for $32
Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
What is this bid for?
Site Visit: A site visit will be held on December 1, 2026, at 9:00 a.m. ET. Interested vendors should meet at building 6 at the Richard L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202. See map and pinned location below for building 6. Following the walkthrough of the main hospital, vendors may attend an additional walkthrough at the off-site location: 9045 East 59th Street, Building 402, Indianapolis, IN 46216. Please note that transportation to the off-site location will not be provided by the VA. RFI Responses Submitted by: Gunnar Sager, COO, FinalLine Solutions L.L.C. INFORMATION NEEDED: 1.Site visit PWS §§ 7, 8, 11 and Appendix A. Can the VA arrange a pre-quote site visit at both the main medical center and Building 402 for FinalLine Solutions and its prospective kitchen exhaust cleaning and fire protection subcontractors? We would like to see the three Canteen hoods (C-1166), the Production Kitchen hood (C-B144) and its upper-floor duct and fan connections, the rooftop exhaust fans, the Building 402 hood, suppression system and grease trap, and the Kidde IND-21 units at Buildings 1 and 22. Please provide available dates and times, the meeting location, and any registration, escort or ID requirements. Yes, a pre-quote site visit can be arranged. 2.Exhaust duct routes and access PWS § 7 and Appendix A.2. PWS § 7 refers to "the eight previously listed main-campus duct systems." Please identify those eight systems. Can the VA also provide any available duct drawings or route sketches, fan and access-panel locations, and known inaccessible sections, particularly for the Production Kitchen and the fourth- and fifth-floor connections? If a site visit cannot be arranged, please provide any photos or prior cleaning reports that show existing access conditions. The eight systems were a reference to language in the previous contract. The PWS has been updated to remove that language, as the VA is uncertain what it was referring to. The PWS has also been updated to include exhaust fan locations. The rest can be determined by a site visit. Previous cleaning reports, including one dated April 2026 is attached, that includes photos in response to this RFI. 3.Building 402 grease trap PWS §§ 8, 11 and Appendix A.3. Please confirm the trap type and capacity (gallons), the cover location, and the approved overnight pump-truck staging location. If known, please provide the approximate hose distance from the staging point to the trap and any vehicle size, weight or access restrictions. Unknown. Can be determined by the offeror during scheduled site visit. 4.Building 402 equipment Appendix A.1 and A.2. Please confirm the make, model and agent type of the Building 402 kitchen suppression system (KS-05) and the exhaust fan ID serving hood KH-05. Unknown. Can be determined by the offeror during a scheduled site visit. 5.Prior service history PWS § 5 and Appendix A.4. PWS § 5 requires the schedule to use verified prior service dates and states that a contract transition does not restart intervals. Please provide the current or most recent contractor's service records, or at minimum the last completion dates, for each suppression unit (monthly, semiannual and annual), each hood cleaning (KH-01 to KH-05) and the GT-01 pump-out. Please also identify any work currently overdue. According to our records it is believed to be as follows: KH-1 to KH-04 Fire Semi-Annual Inspections were completed on 10/20/2026. Cleanings for these systems were completed on 10/26/2026. KH-5 was cleaned in September 2026, the Semi-annual inspection date is unknown and assumed due. GT-01 was cleaned in September 2026. HM-01 to HM-05 Semi-annual inspections were completed on 10/20/2026. 6.Extended-interval testing PWS § 9 and Appendix A.4. Please identify any extended-interval maintenance or testing known to be due during the base or option years, along with the affected system IDs and anticipated due dates. If any of this work must be priced with the quote, please identify the applicable line item. See updated pricing schedule attached. 7.Personnel credentialing VAAR 852.204-70 and 852.204-72; PWS § 11. Will contractor and subcontractor technicians performing recurring monthly and quarterly service need PIV cards or background investigations, or will VA-issued temporary or visitor badges be sufficient? Please identify any processing lead time needed before the first visit. Contractor and subcontractor personnel must satisfy the applicable VA personnel-vetting and credentialing requirements before beginning work. The required investigation level, identification credential, and processing lead time will be confirmed by the CO in coordination with the responsible VA security personnel. A visitor badge shall not be assumed to replace required vetting. 8.Price schedule format Solicitation § B.2; PWS § 2 and Appendix B. Section B.2 requests a single monthly price for each performance year, while PWS § 2 calls for separately identifiable service categories. Will the VA accept the completed B.2 schedule with a separate supporting price breakdown by service category (monthly suppression inspections, semiannual suppression service, hood inspection and cleaning, grease trap service), or is there a required format? See updated pricing schedule attached. 9.Anticipated start date Solicitation § B.2; PWS § 2. Is January 1, 2027 still the anticipated start date for the base period? This is a target start date- the POP for the base will begin upon award. Submitted by: Healing Hands Healing Hearts, LLC INFORMATION NEEDED: 1. PWS Section 7 - Please confirm whether all areas of the kitchen exhaust systems, including the hoods, ductwork, exhaust fans, and rooftop components, are easily accessible for cleaning. If any special access equipment is needed, please advise. Offeror can make this determination during a scheduled site visit. 2. PWS Sections 6 / Appendix B - If deficiencies are found during inspection or maintenance, please confirm whether repairs and replacement parts are included in the contract price or will be handled separately by the Government. PWS Section 6.2 specifically mentions Replace metal fusible links at the required interval, and replace routine seals, nozzle caps, and other included consumables as required. Use the correct listed parts and temperature ratings. Do not treat reusable detection elements as disposable metal links . However, contract terms to be determined by the CO. 3. Appendix A.1 / A.4 - Please provide, if available, the make/model and system size or cylinder/tank capacity for the fire suppression systems included in the scope, along with the most recent inspection reports. Included previous inspection reports with that information to CO in response to this RFI-see attached. Contractor is responsible for determining accuracy. A pre-bid site visit can be arranged. 4.PWS Section 7 / Appendix A.4 - Please advise when each kitchen exhaust system was last cleaned and provide the most recent cleaning reports, if available. See attached. 5. PWS Section 8 / Appendix A.3 - For the grease trap at Building 402, please provide the approximate size/capacity, location, and access conditions, and confirm whether the contractor is responsible for disposal of the removed grease/waste. Site Visit Request: We would also like to request a site visit prior to the proposal due date, if possible, to review the systems and existing site conditions. Please see information above regarding site visit information. Submitted by: Thomas Robinson, CSIC Solutions LLC INFORMATION NEEDED: Appendix A.1 lists KS-01 through KS-04 as ANSUL wet chemical (NFPA 17A), but KS-05 (kitchen suppression, 59th Street, Building 402; KH-05) shows only 'Installed kitchen system / Manufacturer manual.' Please provide the manufacturer, model, and agent type of the KS-05 system so offerors can confirm factory-authorized technicians for that make and model and price it accurately. Please see information ...
Questions about this bid
When are offers due for 36C25027Q0078?
Offers are due December 8, 2026, 10:00 AM (closes in 10 days).
Which agency is buying, and where?
Department of Veterans Affairs in Dayton, OH. BidFinder lists 474 open federal bids from this agency right now.
How do I submit an offer?
Open the official notice on SAM.gov: it has the documents and the instructions for responding.
Is this bid still open?
Yes, it is listed as open here. BidFinder last read it from SAM.gov on November 28, 2026.
Where can I find more bids like this?
- All bids from Department of Veterans Affairs (Dayton, OH)474
- Federal maintenance and repair bids in Ohio31
- Maintenance and repair: every open bid1,027
- Open bids under NAICS 811310 (Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance)93
- Open bids in Dayton, OH21
- Open bids in Ohio2,638
- Bids closing in 7 days
What else is this agency asking for?
- closes in 16 days
- closes in 20 days
- closes in 13 days
- closes in 11 days
- closes in 6 days
Which similar bids are open?
- closes in 2 days
- closes in 10 days
- closes in 10 days
- closes in 41 days
- closes in 10 days
- closes in 12 days
- closes in 6 days
- closes in 13 days
- closes in 12 days
- closes in 5 days