Sources Sought · W912P627X1CZ7
Market Survey Sources Sought Notice for Barrier IIB ATS Systems Replacement
Department of the Army in Chicago, IL posted this notice (Sources Sought), which does not ask for offers: Market Survey Sources Sought Notice for Barrier IIB ATS Systems Replacement. Offers are due December 7, 2026, 3:00 PM. The official notice on SAM.gov has the documents and says how to send an offer.
Data checked November 29, 2026 against SAM.gov.
This is a notice (Sources Sought), not a request for offers.
- Agency
- Department of the Army FederalW072 Endist Chicago
- Place
- Chicago, IL
- Offers due
- December 7, 2026, 3:00 PM (ET) closes in 8 days
- Estimated value
- not stated
- Notice type
- Sources Sought
- Category
- Maintenance and repair
- Product service code (PSC)
- Z2BG
- Posted
- November 24, 2026
- Solicitation number
- W912P627X1CZ7
Opens the notice on SAM.gov, with its attachments and how to respond.
Black Friday: 1 year of same-day bid alerts for $32
Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
What is this bid for?
SOURCES SOUGHT NOTICE / MARKET SURVEY Project Title: Barrier IIB Automatic Transfer Switch (ATS) System Replacement************** Procurement Identification: PANGLR -26 -034692**************NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19.0 Million)**************PSC Code: Z2BG Repair or Alteration of Electronic and Communications Facilities**************Estimated Project Magnitude / Cost: Between $250,000 and $500,000************** Primary Performance Location: Chicago Sanitary and Ship Canal Electric Dispersal Barrier Facility (USGS / USACE Facility), 790 East Old Romeo Rd., Lockport/Romeoville, IL 60441*****************By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Barrier IIB Automatic Transfer Switch (ATS) System Replacement. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of an RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party expense.***************t this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFQ. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice.*******GOVERNMENT REQUIREMENTS Under the proposed contract, the contractor will be required to provide turnkey engineering, procurement, programming, fabrication, removal, installation, testing, and commissioning services for the controls modernization of the Barrier IIB Automatic Transfer Switch (ATS) and Emergency Generator Paralleling Switchgear line-up (originally installed circa 2010).*********Scope Summary:************The project requires the complete replacement and modernization of obsolete proprietary electronic control modules, network processors, transducers, and human-machine interface (HMI) touchscreens with modern, open-architecture, commercial-off-the-shelf (COTS) industrial control components.************The contractor shall provide a complete, non-proprietary functional solution meeting the following performance characteristics without relying on single-source, dealer-locked software or hardware:**************1. Master, Utility, Tie, and Generator Control Processors:************Furnish and program modular, open-architecture Programmable Logic Controllers (PLCs) or purpose-built Digital Generator Paralleling Controllers with industrial Ethernet communications.************** Provide dedicated processing hardware for:************* Master Switchgear Control (redundant processors AP1 and AP2)******** Generator Breaker Controls (dedicated controller per generator breaker)**********Utility Incoming Breaker Control (dedicated controller per utility breaker)*********Tie Breaker Control (dedicated controller per tie breaker)**********The control logic must automatically perform utility sensing, automatic transfer, generator start sequencing, dead-bus closing, auto-synchronization, isochronous kW and kVAR load sharing, soft-load open/closed-transition utility return, and load shed/add management.*********Programming must utilize non-proprietary, standard industrial software (e.g., standard IEC 61131-3 logic platforms).**************2. Power Sensing and Synchronization:********* Supply and install modern digital multi-function power transducers and automatic synchronizer / sync-check relays (Device 25) for each generator breaker, tie breaker, and utility source.*************3. Operator Interface (HMI) Visualization:***********Supply and install an industrial widescreen touchscreen display panel (minimum 15-inch diagonal) and dedicated processor running an industrial operating system.************The HMI software must display dynamic animated single-line electrical diagrams, breaker metering and status, alarm logging and management, mode selection (Auto/Manual/Test), and system diagnostics.***********Interface drivers must communicate natively via standard industrial protocols (Ethernet/IP, Modbus TCP, PROFINET, or OPC UA).**************4. Network and Communications:*********Furnish industrial managed Ethernet switches configured in a fault-tolerant ring communications architecture (replacing obsolete serial/proprietary network topologies).***********Provide protocol data gateways where necessary to output system data points (Modbus RTU/TCP or BACnet/Ethernet) to site supervisory networks.**************5. Simulation and Pre-Testing:***********All PLC and HMI programming must be factory bench-tested and verified using a static simulator reproducing the site sequence of operations prior to mobilization.**************6. On-Site Installation, Commissioning, and Constraints:************Perform on-site removal of legacy controllers, field wiring, mounting, terminations, calibrations, engine startup assistance, and full-load validation.************* Outage Limitation: On-site replacement and cutover must be accomplished within an aggressive coordinated window (estimated up to six (6) consecutive calendar days).************Life-Safety Operational Continuity: The Chicago Dispersal Barrier operates 24/7. During modernization, the emergency power system must remain functional such that at least one (1) emergency generator is continuously capable of automatic operation or rapid manual start to back up the site load.*************Deliver updated CAD as-built production drawings, sequence of operations manuals, bill of materials, component data sheets, and comprehensive on-site operator training.**********Estimated Period of Performance:********* Pre-engineering, hardware procurement, programming, and simulation testing: Ninety (90) to One Hundred Twenty (120) calendar days from Notice to Proceed (NTP).**************On-site physical installation, cutover, testing, and training: Up to six (6) consecutive calendar days.**********REQUESTED INFORMATIONAL interested Small Businesses, certified HUBZone, 8(a), Women-Owned Small Businesses (WOSB), or Service-Disabled Veteran-Owned Small Businesses (SDVOSB) should respond to this market survey/sources sought via email no via email no later than December 7, 2026, at 2:00 p.m. Central Time.*************The following requests are designed to apprise the U.S. Army Corps of Engineers, Chicago District, of any prospective small business with industrial electrical switchgear, automatic transfer switch (ATS), and PLC control integration capabilities. This Agency requests that interested contractors submit the following:**************7. Company Profile Small Business Status:******* Company name, physical address, website, and primary point of contact (name, title, telephone number, and email address.*******Contractors Unique Entity Identifier (UEI) and CAGE Code.*********** In consideration of North American Industry Classification System (NAICS) code 238210 with a small business size standard of $19.0 Million, which of the following small business categories is your business classified under, if any Small Business****Service-Disabled Veteran-Owned Small Business (SDVOSB)********* Small ...
Questions about this bid
When are offers due for W912P627X1CZ7?
Offers are due December 7, 2026, 3:00 PM (closes in 8 days).
Which agency is buying, and where?
Department of the Army in Chicago, IL. BidFinder lists 858 open federal bids from this agency right now.
How do I submit an offer?
Open the official notice on SAM.gov: it has the documents and the instructions for responding.
Is this bid still open?
This is a notice (Sources Sought), not a request for offers.
Where can I find more bids like this?
- All bids from Department of the Army (Chicago, IL)858
- Federal maintenance and repair bids in Illinois19
- Maintenance and repair: every open bid1,020
- Open bids under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors)60
- Open bids in Chicago, IL1
- Open bids in Illinois143
- Bids closing in 7 days
What else is this agency asking for?
- closes in 18 days
- closes in 31 days
- closes in 18 days
- closes in 5 days
- closes in 39 days
Which similar bids are open?
- closes in 10 days
- closes in 19 days
- closes in 38 days
- closes in 18 days
- closes in 9 days
- closes in 2 days
- closes in 10 days
- closes in 4 days
- closes in 8 days
- closes in 4 days