BIDFINDER Account

Justification · N5523626R0009

USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Department of the Navy in San Diego, CA posted this notice (Justification), which does not ask for offers: USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement. No due date is given here; the official notice states the terms. The official notice on SAM.gov has the documents and says how to send an offer.

Data checked November 29, 2026 against SAM.gov.

This is a notice (Justification), not a request for offers.

Agency
Department of the Navy FederalSouthwest Regional Maint Center
Place
San Diego, CA
Offers due
no due date given
Estimated value
not stated
Notice type
Justification
Category
Vehicles and transport
NAICS code
333618 Other Engine Equipment Manufacturing
Product service code (PSC)
2815
Posted
November 4, 2026
Solicitation number
N5523626R0009
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Vehicles and transport in California

1 free weekly alert, or same-day alerts (up to 50) with BidFinder Pro ($8 a month).

BLACK FRIDAY · 67% OFF · ENDS 30 NOV

Black Friday: 1 year of same-day bid alerts for $32

Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.

See Black Friday offer

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

What is this bid for?

RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.

Questions about this bid

When are offers due for N5523626R0009?

No due date is given here. Check the official notice on SAM.gov for the terms.

Which agency is buying, and where?

Department of the Navy in San Diego, CA. BidFinder lists 1,581 open federal bids from this agency right now.

How do I submit an offer?

Open the official notice on SAM.gov: it has the documents and the instructions for responding.

Is this bid still open?

This is a notice (Justification), not a request for offers.

Where can I find more bids like this?

What else is this agency asking for?

Which similar bids are open?