Sources Sought · W912DS27S0006
RFI USMMA Campus Modernization Program SATOC Seawall Project
Department of the Army in Kings Point, NY posted this notice (Sources Sought), which does not ask for offers: RFI USMMA Campus Modernization Program SATOC Seawall Project. Offers are due December 4, 2026, 4:00 AM. The official notice on SAM.gov has the documents and says how to send an offer.
Data checked November 28, 2026 against SAM.gov.
This is a notice (Sources Sought), not a request for offers.
- Agency
- Department of the Army FederalW2SD Endist New York
- Place
- Kings Point, NY
- Offers due
- December 4, 2026, 4:00 AM (ET) closes in 6 days
- Estimated value
- not stated
- Notice type
- Sources Sought
- Category
- Construction
- Product service code (PSC)
- Y1PZ
- Posted
- November 12, 2026
- Solicitation number
- W912DS27S0006
Opens the notice on SAM.gov, with its attachments and how to respond.
Black Friday: 1 year of same-day bid alerts for $32
Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
What is this bid for?
THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLY This announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below. This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as "Proprietary" will be handled accordingly. The U.S. Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million. The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000. Work under this contract is expected to begin in winter of 2028. The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY. The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below: 1. Project Purpose and Program Context USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion. ________________________________________ 2. Existing Conditions The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north-south along the western waterfront. The seawall exhibits significant variability in height, construction type and functional purpose along with its length. At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap. (See Attachment - USMMA Seawall Site Map) Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone façade walls. Presume the stone façade walls incorporate a concrete core based on visual assessment. South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent. The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate further erosion, and support a future 12 ft. wide roadway/walkway to connect existing roads on campus. ________________________________________ 3. Design and Construction Scope This project will rehabilitate/restore 2,800-feet of seawall at the United States Merchant Marine Academy. The scope includes progressing the government provided 35% design consisting of nine segments to 100% Design, completing all required permitting documents, reconstructing the seawall, and restoring the waterfront. The contractor will review, validate, and advance the government-furnished 35% Design RFP package to 65% and 100% Issued for Construction (IFC) submittals across civil, structural, coastal, and geotechnical disciplines. Following design finalization for a segment construction will commence to remove and/or restore the degraded segment of seawall. The contractor will be required to complete the work in accordance with all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work. ________________________________________ 4. Design Standards and Performance Requirements All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC). ________________________________________ 5. Acquisition Strategy and Contracting Approach The Government intends to establish a Design-Build (D-B) Single Award Task Order Contract (SATOC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a total contract capacity of $70,000,000 over an anticipated five-year ordering period. INFORMATION REQUESTED FROM RESPONDENTS Areas of particular interest to the government are responses to the following questions: 1) Is your firm interested in competing for this project? If so, do you anticipate proposing as an integrated prime contractor/Designer of Record (DOR) team, a joint venture (JV), or a prime construction contractor with a subcontracted design firm? 2) Based on the anticipated scope (steel sheet pile, bulkhead replacement, concrete seawall replacement, splash pads, and drainage system replacement), what percentage of the construction work do you anticipate self-performing with your own labor and equipment versus subcontracting? 3) Describe your teams experience over the past 5-10 years designing and constructing coastal infrastructure or shoreline stabilization projects of similar scale (exceeding 2,000 linear feet) or projects involving multiple, distinct structural wall types within a single contract. 4) What is the largest existing bulkhead or seawall replacement contract (by total dollar value and approximate linear footage) that your firm has completed as the prime contractor and/or Designer of Record? (Please specify whether each project was executed as Design-Build or Design-Bid-Build). 5) In a Design-Build delivery model, how would your team approach executing in-water geotechnical borings in tidal Long Island Sound conditions? Do you possess the in-house marine equipment and personnel to perform this subsurface investigation, or would you subcontract it to a specialized marine geotechnical firm? 6) Given that the 2,800-foot seawall is divided into 9 distinct segments with varying construction types (e.g., sheet pile, gravity wall, revetment), what specific technical challenges or efficiencies do you foresee in transitioning between these different wall typologies? 7) Describe your experience obtaining and/or working in compliance with Clean Water Act Section 401 Water Quality Certifications through the New York State Department of Environmental Conservation (NYSDEC) and Section 404 permits through USACE Regulatory, including managing design and construction schedules around Long Island Sound tidal and seasonal in-water work windows. What other permits would you anticipate on this project? 8) To minimize shoreline exposure, tidal vulnerability, and site disruption, would you recommend designing and constructing the 9 segments sequentially ...
Questions about this bid
When are offers due for W912DS27S0006?
Offers are due December 4, 2026, 4:00 AM (closes in 6 days).
Which agency is buying, and where?
Department of the Army in Kings Point, NY. BidFinder lists 859 open federal bids from this agency right now.
How do I submit an offer?
Open the official notice on SAM.gov: it has the documents and the instructions for responding.
Is this bid still open?
This is a notice (Sources Sought), not a request for offers.
Where can I find more bids like this?
What else is this agency asking for?
- closes in 19 days
- closes in 32 days
- closes in 19 days
- closes in 6 days
- closes in 40 days
Which similar bids are open?
- closes in 44 days
- closes in 7 days
- closes in 10 days
- closes in 6 days
- closes in 7 days
- closes in 2 days
- closes in 10 days
- closes in 10 days
- closes in 9 days
- closes in 10 days