BIDFINDER Account

Solicitation · N0010427QTA24

Valve, Solenoid

Department of the Navy in Mechanicsburg, PA is taking offers on this bid: Valve, Solenoid. Offers are due December 10, 2026, 3:30 PM. The official notice on SAM.gov has the documents and says how to send an offer.

Data checked November 28, 2026 against SAM.gov.

Agency
Department of the Navy FederalNAVSUP Weapon Systems Support Mech
Place
Mechanicsburg, PA
Offers due
December 10, 2026, 3:30 PM (ET) closes in 12 days
Estimated value
not stated
Notice type
Solicitation
Category
Other goods
NAICS code
332919 Other Metal Valve and Pipe Fitting Manufacturing
Product service code (PSC)
4810
Posted
November 10, 2026
Solicitation number
N0010427QTA24
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Other goods in Pennsylvania

1 free weekly alert, or same-day alerts (up to 50) with BidFinder Pro ($8 a month).

BLACK FRIDAY · 67% OFF · ENDS 30 NOV

Black Friday: 1 year of same-day bid alerts for $32

Price of 4 months (normally $96). Up to 50 alerts, unlimited search, no renewal. Ends 30 Nov.

See Black Friday offer

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

What is this bid for?

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email removed]| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ "All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issueThe Government is seeking a Repair Turnaround Time (RTAT) of: 274 Days_ Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement i Check one: Firm-fixed-Price ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current ^^^^^^^^^^^^^^^TESTING AND EVALUATION IF BEYOND REPAIR^^^^^^^^^^^^^^^ T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evalua The T&E fee (if asset is determined BR/BER) was determined/computed based on: AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same ^^^^^^^^^^^^^^^ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW^^^^^^^^^^^^^^^ New unit price:__________ New unit delivery lead-time:__________ " 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the VALVE, SOLENOID . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The VALVE, SOLENOID repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;7PZX0 2AAT12294 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index ...

Questions about this bid

When are offers due for N0010427QTA24?

Offers are due December 10, 2026, 3:30 PM (closes in 12 days).

Which agency is buying, and where?

Department of the Navy in Mechanicsburg, PA. BidFinder lists 1,583 open federal bids from this agency right now.

How do I submit an offer?

Open the official notice on SAM.gov: it has the documents and the instructions for responding.

Is this bid still open?

Yes, it is listed as open here. BidFinder last read it from SAM.gov on November 28, 2026.

Where can I find more bids like this?

What else is this agency asking for?

Which similar bids are open?